Now showing items 1-4 of 4

    • Luskay, L.; Haasl, T.; Schwab, J.; Beattie, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2003)
      Portland Energy Conservation Incorporated (PECI) in conjunction with the National Renewable Energy Laboratory (NREL) staff performed an Assessment of Load and Energy Reduction Techniques (ALERT) retrocommissioning evaluation on ...
    • Luskay, L.; Haasl, T.; Irvine, L.; Frey, D. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2002)
      Commissioning of existing buildings, or “retrocommissioning” is a systematic process to identify operational and maintenance (O&M) improvements that optimize building performance and ensure that building systems function ...
    • Haasl, T.; Potter, A.; Irvine, L. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 2001)
      It is possible to save thousands of dollars in energy costs through a few low-cost operational adjustments but those opportunities are often hidden. Retrocommissioning is a systematic investigation process for improving ...
    • Haasl, T.; Wilkinson, R. (Energy Systems Laboratory (http://esl.tamu.edu); Texas A&M University (http://www.tamu.edu), 1998)
      Using the commissioning process, states are beginning to improve and optimize their existing building stock as well as ensure that their new construction projects perform according to design. This paper reports on the ...